Better decisions before mobilization
Preconstruction
Early planning turns incomplete information into a practical path for scope, budget, schedule, procurement, and risk.
Discuss your project
What ICGM provides
Build a reliable plan before work begins.
Good early decisions depend on knowing what is defined, what is assumed and what still needs an answer. ICGM develops a practical construction view of scope, cost, sequencing and procurement before mobilization.
Conceptual and preliminary budgeting
Constructability and scope-gap review
Value analysis and alternates
Long-lead procurement planning
Subcontractor market outreach and bid leveling
Our approach
Turn early information into a buildable plan.
Defined responsibilities and clear checkpoints connect the early plan to the work in the field.
Understand the conditions
Review the owner's requirements, available drawings and existing-site information. Identify scope gaps, access constraints and items requiring investigation or design clarification.
Develop the budget
Prepare estimates appropriate to the available design information. Record assumptions, allowances and exclusions, compare alternatives, and seek trade input where it improves scope and pricing clarity.
Test the sequence
Study logistics, phasing, long-lead equipment and major construction dependencies. Connect design and owner decisions to the procurement dates and milestones they affect.
Prepare the transition
Align the current scope, estimate, schedule and outstanding decisions. Establish the information needed for procurement and mobilization rather than passing unresolved assumptions into the field.
- Documented estimate assumptions and scope clarifications
- Constructability, phasing and procurement priorities
- A clearer basis for the decision to proceed